R+D Project, funded by the Federal Ministry of Economics and Technology (BMWi), Germany. The Project ‘MPLS 20 – Maritime Pipe Loading Systems 20'‘ is carried out in co-operation with Nexans Deutschland GmbH, Brugg Rohrsysteme GmbH, IMPaC Offshore Engineering and the Division of Naval Architecture and Ocean Engineering of the Technical University Berlin.
Project duration: 10/2007-09/2010.
Goal of the project is the development of an innovative concept for an offshore LNG transfer terminal system, based on vacuum insulated, flexible cryogenic pipes with inner diameter of 16-inch up to 20-inch. |