Reference Project - Offshore Wind
Geotechnics
Geotechnical Verification of Suction Cans for Offshore Substation 'GTI' - German North Sea
Project Facts
Client
Global Tech I Offshore Wind GmbH
Project Location
North Sea, Germany
Year
06/2012 – 12/2012
IMPaC’s Scope
Geotechnical engineering
Ultimate Limit State (ULS) verification
Project Characteristics
Suction cans are the main foundation element of the offshore substation. IMPaC provided geotechnical engineering design verification of the suction cans of a self-erecting offshore substation.
FEM calculations for post installation soil parameter, and for degraded soil parameter (due to cyclic load from wind, wave and current) have been carried out. Furthermore, the numerical calculations were performed considering no scour and 1.1 m scour depth. The suction cans have a diameter of 11 m, a penetration depth of 9 m and clearance between suction can equal to 40 m.
The geotechnical design verification was carried out according to the BSH requirements.