Reference Project - Offshore Wind

Platforms - Foundation, Jacket & Topside
Detailed Design of Met Masts for Wind Farms 'Nordsee Ost' and 'Ijmuiden' – German and Dutch Sector of North Sea

Project Facts

Client
Van Oord

Operator
RWE Innogy

Project Location
Southern North Sea, Germany and Dutch Sector of North Sea

IMPaC’s Scope
Detailed design of met mast foundation

Project Characteristics

The offshore wind farm ‘Nordsee Ost’ with a capacity of 295 MW is located 35 km west of Amrum in the German North Sea. IMPaC has carried out the detailed design for the met mast foundation including Finite Element (FE) based analysis with ANSYS software including:

  • Ultimate strength analysis of met mast tower
  • Ultimate strength analysis of working platform
  • Ultimate strength analysis of foundation
  • Ultimate strength analysis of overall structure
  • Ultimate strength analysis of grouted connection between monopile and transition piece
  • Fatigue strength analysis of overall structure
  • Boat impact analysis
  • Lifting analysis
  • Flange connection analysis

Furthermore, IMPaC has carried out a pile drivability study and a pile driving fatigue study for the monopile foundation and has prepared corrosion protection and sour protection design.