Reference Project – Energy Onshore
Power & Utilities – Cooling Water Systems and other Utilities
Mobin Utilities Complex – Iran
Project Facts
Client
Sadra
Project Location
Bandar Assaluyeh, Iran
Investment
400 million USD
IMPaC’s Services
45,000 hours
Year
07/2002 – 11/2004
IMPaC’s Scope
Endorsement of basic design
Detailed design
Steady state and transient stress analysis
Preparation of construction tender
Preparation of commissioning and testing procedures
Project Characteristics
The sea water cooling system for a petrochemical plant of the Mobin Utilities Complex has a total water quantity of 500,000 m³/h and pipeline diameter up to 3.0 m.
After endorsement of the basic design for offshore pipelines and facilities IMPaC was requested to prepare the detailed design of the entire cooling water system and weirs including equipment and material specifications. IMPaC carried out steady state and transient stress analysis.
Within this major project with an investment of approx. 400 million USD IMPaC prepared the construction tender as well as commissioning and testing procedures.
The following in-house available disciplines have been involved in the project execution: process, instrumentation & control, pipeline/piping, civil/structural, electric, mechanical, CAE & procurement